3.071 MMBTU/hr Schmid UTSR 900 Pellet Boiler

Contact Information

Address
33 Edgmont Drive
Presque Isle,  ME  04769

County
Aroostook County
 

Primary Contact
Tim Crowley
President
207-768-2811
207-551-5738
ntcrowle(at)nmcc(dot)edu
Operations Contact
Barry Ingraham
Director of Physical Plant and Technology
207-768-2706
207-551-5748
barry(at)nmcc(dot)edu
Other Contact
Leah Buck
Asst. Dean of Continuing Education
207-768-2768
nlbuck(at)nmcc(dot)edu

Existing Site Information

Facility - Type Public College
Multi phase project (Y/N) N
Additional phase costs ($) na
Facility - Size (Total) Sq Ft 170,275
Total number of Students 2,000
Total number of Staff (in FTE's)  

 

Building One Christie Complex
Square Feet 125,500
Age 49
Pipe Distance (ft) 150
Building Two Mailman Trades Buildings
Square Feet 44,700
Age 49
Pipe Distance (ft) 0

 

Building Three na
Square Feet na
Age na
Pipe Distance (ft) na
Building Four
na
Square Feet
na
Age na
Pipe Distance (ft) na

 

Current system - Type #2 oil
Steam (S) or Hot Water (HW) HW
Current Boiler - Name of HB Smith Mills
Current Boiler Age (In Years)  
Control System (Manufacturer) Honeywell
Current Type #2 oil
Current Fuel Volume to be displaced (Gallons) 46,988
Fuel Use Data (Years + Average) (Gallons) 55,280

Project Information

New System Boiler - Name Schmid
New System Boiler - Model Number UTSR 900
New System Boiler - Rated Capacity 3.071 MMBTU/hr
Fuel Type (Chips Or Pellets) Pellets
New System Steam (s) or Hot Water (HW) HW
Storage Type Metal silo constructed within footprint of existing structure
Storage Location Inside exisiting structure footprint
Storage Capacity Tons 41
Storage Description Notes Silo built inside existing wall structure of building (roof removed)
Fuel Primary Transport Type Auger
Fuel Secondary Transport Type  na
Boiler Location (Existing Space or New Space) Existing space
If New Space - Building Description na
New Space - Size na
Thermal Storage (Y/N) Y
Thermal Storage Capacity 1,750 gallons
System Connection(s) Description Full integration with exising systems
Heat Exchanger (Y/N) N
Grant Amount $ 500,000.00
Owner Cost Share $ 485,726.00
Total Cost $ 985,726.00
Application Date March 21, 2011
Completion Date December 31, 2012

Estimates

Historic Oil Use (Annual Average) (gallons) 55,280
Historic Oil Use (Annual Average) (cost $$$) $ 165,840.00
Historic Fuel Volume to be Displaced (Gallons) 46,988
Expected Cost of Displaced Fuel - Total $$$ $ 140,964.00
Base Fuel Price 1 (Used in Application) $ 3.00
Base Fuel Price 2 (Used in Application) $ -
   
Wood Fuel Price (Used in Application) $ 200.00
Expected Wood Use - Tons 544
Expected Wood Use - $$$ $ 108,800.00
   
Expected Annual Oil Use
(Gallons in Addition to Wood)
8292
Expected Annual Oil Cost
($$$ in Addition to Wood)
$ 24,876.00
   
Total cost of Wood and Oil (Annual) - $$$ $ 133,676.00
Expected Annual Fuel Savings -$$$ $ 32,164.00
   
Expected Savings Shown in Application $ 43,400.00

Historical Data

Base Fuel Price 1 (Used in Application) $ 3.00
Base Fuel Price 2 (Used in Application) $ -
Wood Fuel Price (Used in Application) $ 200.00

 

Five Year Fuel Use History Year 1  
Calendar Year 2010
Fuel Use in Gallons 74,455
Fuel Use Cost ($) $ 152,514.00
Five Year Fuel Use History Year 2  
Calendar Year 2009
Fuel Use in Gallons 69,107
Fuel Use Cost ($) $ 230,646.00
   
Five Year Fuel Use History Year 3  
Calendar Year 2008
Fuel Use in Gallons 69,028
Fuel Use Cost  ($) $ 195,394.00
Five Year Fuel Use History Year 4  
Calendar Year 2007
Fuel Use in Gallons 75,085
Fuel Use Cost ($) $153,520.00
   
Five Year Fuel Use History Year 5  
Calendar Year 2006
Fuel Use in Gallons 77,489
Fuel Use Cost ($) $154,079.00
 

 

Five Year Total Fuel Use (Gallons) 365,164
Five Year Yearly Average Fuel Use (Gallons) 73,033
Five Year Total Fuel Cost ($) $ 655,507.00
Five Year Average Fuel Cost ($) $ 131,101.40

Fuel Use

Northern Maine Community College

Year Ending 4/30/2013  4/30/2014 4/30/2015  4/30/2016 4/30/2017 Cumulative
Totals
 
PELLETS used 308.00         308.00  (in tons)
ACTUAL COST  $61,446.00          $61,446.00 (cost + shipping costs)
OIL used  10,910.00          10,910.00 (in gallons)
ACTUAL COST  $35,566.60          $35,566.60 (delivered cost)
TOTAL COST  $97,012.60          $97,012.60 (cost of both fuels)
 