Description: 3.071 MMBTU/hr Schmid UTSR 900 Pellet Boiler
Contact Information
Address
33 Edgmont Drive
Presque Isle, ME 04769
County
Aroostook County
Operations Contact
Barry Ingraham
Director of Physical Plant and Technology
207-768-2706
207-551-5748
barry(at)nmcc(dot)edu |
Existing Site Information
Facility - Type |
Public College |
Multi phase project (Y/N) |
N |
Additional phase costs ($) |
na |
Facility - Size (Total) Sq Ft |
170,275 |
Total number of Students |
2,000 |
Total number of Staff (in FTE's) |
|
Building One |
Christie Complex |
Square Feet |
125,500 |
Age |
49 |
Pipe Distance (ft) |
150 |
Building Two |
Mailman Trades Buildings |
Square Feet |
44,700 |
Age |
49 |
Pipe Distance (ft) |
0 |
Building Three |
na |
Square Feet |
na |
Age |
na |
Pipe Distance (ft) |
na |
Building Four
|
na |
Square Feet
|
na |
Age |
na |
Pipe Distance (ft) |
na |
Current system - Type |
#2 oil |
Steam (S) or Hot Water (HW) |
HW |
Current Boiler - Name of |
HB Smith Mills |
Current Boiler Age (In Years) |
|
Control System (Manufacturer) |
Honeywell |
Current Type |
#2 oil |
Current Fuel Volume to be displaced (Gallons) |
46,988 |
Fuel Use Data (Years + Average) (Gallons) |
55,280 |
Project Information
New System Boiler - Name |
Schmid |
New System Boiler - Model Number |
UTSR 900 |
New System Boiler - Rated Capacity |
3.071 MMBTU/hr |
Fuel Type (Chips Or Pellets) |
Pellets |
New System Steam (s) or Hot Water (HW) |
HW |
Storage Type |
Metal silo constructed within footprint of existing structure |
Storage Location |
Inside exisiting structure footprint |
Storage Capacity Tons |
41 |
Storage Description Notes |
Silo built inside existing wall structure of building (roof removed) |
Fuel Primary Transport Type |
Auger |
Fuel Secondary Transport Type |
na |
Boiler Location (Existing Space or New Space) |
Existing space |
If New Space - Building Description |
na |
New Space - Size |
na |
Thermal Storage (Y/N) |
Y |
Thermal Storage Capacity |
1,750 gallons |
System Connection(s) Description |
Full integration with exising systems |
Heat Exchanger (Y/N) |
N |
Grant Amount |
$ 500,000.00 |
Owner Cost Share |
$ 485,726.00 |
Total Cost |
$ 985,726.00 |
Application Date |
March 21, 2011 |
Completion Date |
December 31, 2012 |
Estimates
Historic Oil Use (Annual Average) (gallons) |
55,280 |
Historic Oil Use (Annual Average) (cost $$$) |
$ 165,840.00 |
Historic Fuel Volume to be Displaced (Gallons) |
46,988 |
Expected Cost of Displaced Fuel - Total $$$ |
$ 140,964.00 |
Base Fuel Price 1 (Used in Application) |
$ 3.00 |
Base Fuel Price 2 (Used in Application) |
$ - |
|
|
Wood Fuel Price (Used in Application) |
$ 200.00 |
Expected Wood Use - Tons |
544 |
Expected Wood Use - $$$ |
$ 108,800.00 |
|
|
Expected Annual Oil Use
(Gallons in Addition to Wood) |
8292 |
Expected Annual Oil Cost
($$$ in Addition to Wood) |
$ 24,876.00 |
|
|
Total cost of Wood and Oil (Annual) - $$$ |
$ 133,676.00 |
Expected Annual Fuel Savings -$$$ |
$ 32,164.00 |
|
|
Expected Savings Shown in Application |
$ 43,400.00 |
Historical Data
Base Fuel Price 1 (Used in Application) |
$ 3.00 |
Base Fuel Price 2 (Used in Application) |
$ - |
Wood Fuel Price (Used in Application) |
$ 200.00 |
Five Year Fuel Use History Year 1 |
|
Calendar Year |
2010 |
Fuel Use in Gallons |
74,455 |
Fuel Use Cost ($) |
$ 152,514.00 |
|
Five Year Fuel Use History Year 2 |
|
Calendar Year |
2009 |
Fuel Use in Gallons |
69,107 |
Fuel Use Cost ($) |
$ 230,646.00 |
|
|
|
Five Year Fuel Use History Year 3 |
|
Calendar Year |
2008 |
Fuel Use in Gallons |
69,028 |
Fuel Use Cost ($) |
$ 195,394.00 |
|
Five Year Fuel Use History Year 4 |
|
Calendar Year |
2007 |
Fuel Use in Gallons |
75,085 |
Fuel Use Cost ($) |
$153,520.00 |
|
|
|
Five Year Fuel Use History Year 5 |
|
Calendar Year |
2006 |
Fuel Use in Gallons |
77,489 |
Fuel Use Cost ($) |
$154,079.00 |
|
|
Five Year Total Fuel Use (Gallons) |
365,164 |
Five Year Yearly Average Fuel Use (Gallons) |
73,033 |
Five Year Total Fuel Cost ($) |
$ 655,507.00 |
Five Year Average Fuel Cost ($) |
$ 131,101.40 |
Fuel Use
|
Year Ending |
4/30/2013 |
4/30/2014 |
4/30/2015 |
4/30/2016 |
4/30/2017 |
Cumulative
Totals |
|
PELLETS used |
308.00 |
|
|
|
|
308.00 |
(in tons) |
ACTUAL COST |
$61,446.00 |
|
|
|
|
$61,446.00 |
(cost + shipping costs) |
OIL used |
10,910.00 |
|
|
|
|
10,910.00 |
(in gallons) |
ACTUAL COST |
$35,566.60 |
|
|
|
|
$35,566.60 |
(delivered cost) |
TOTAL COST |
$97,012.60 |
|
|
|
|
$97,012.60 |
(cost of both fuels) |
|
Additional Notes
Categories
Aroostook County, Hot Water, Wood Pellets,
Extra Files & Images:
| Schmid Boiler @ NMCC | | RealTime System Montior Display |
|