   Poland Regional High School


Description:

2.3 MMBTU/hr MAWERA Viessmann FSB 700 Wood Chip Boiler

Contact Information

Address
1457 Maine Street, Poland  ME 04274
1146 Maine Street, Poland  ME 04274

County
Androscoggin County
 

Primary Contact
Michael Wilhelm
Superintendent
207-998-2727
mwilhelm(at)rsu16(dot)org
Operations Contact
Tony Bennet
Director of Operations and Maintenance
207-998-3462  ext. 122
207-754-3254
tbennett(at)rsu16(dot)org

Existing Site Information

Facility - Type Public School building SAU 16
Multi phase project (Y/N) N
Additional phase costs ($) na
Facility - Size (Total) Sq Ft 134,000
Total number of Students  
Total number of Staff (in FTE's)  

 

Building One Bruce M. Whittier / Poland Regional High School
Square Feet 134,000
Age  
Pipe Distance (ft)  
Building Two na
Square Feet na
Age na
Pipe Distance (ft) na

 

Building Three na
Square Feet na
Age na
Pipe Distance (ft) na
Building Four
na
Square Feet
na
Age na
Pipe Distance (ft) na

 

Current system - Type #2 oil
Steam (S) or Hot Water (HW) HW
Current Boiler - Name of Burnham V1106
Current Boiler Age (In Years) 11
Control System (Manufacturer) Seimens Control Systems
Current Type #2 oil
Current Fuel Volume to be displaced (Gallons) 47,000
Fuel Use Data (Years + Average) (Gallons) 47,0000

Project Information

New System Boiler - Name MAWERA
New System Boiler - Model Number FSB 700
New System Boiler - Rated Capacity 2.30 MMBTU/hr
Fuel Type (Chips Or Pellets) Chips
New System Steam (s) or Hot Water (HW) HW
Storage Type Below grade bunker
Storage Location New building
Storage Capacity Tons 60 Ton / 7800 Cubic Feet
Storage Description Notes Two overhead doors side by side, Undivided bin
Fuel Primary Transport Type Hydraulic live floor
Fuel Secondary Transport Type Auger
Boiler Location (Existing Space or New Space) New building
If New Space - Building Description Stick built metal and wood siding w metal roofing
New Space - Size 40' by 40' (+/-)
Thermal Storage (Y/N) N
Thermal Storage Capacity na
System Connection(s) Description Closed loop to existing boiler room
Heat Exchanger (Y/N) Y
Grant Amount $ 636,372.00
Owner Cost Share $ 76,413.00
Total Cost $ 712,785.00
Application Date January 5, 2010
Completion Date July 29, 2011

Estimates

Historic Oil Use (Annual Average) (gallons) 47,00
Historic Oil Use (Annual Average) (cost $$$) $ 126,430.00
Historic Fuel Volume to be Displaced (Gallons) 47,000
Expected Cost of Displaced Fuel - Total $$$ $ 126,430.00
Base Fuel Price 1 (Used in Application) $ 2.69
Base Fuel Price 2 (Used in Application) $ -
   
Wood Fuel Price (Used in Application) $ 34 .00
Expected Wood Use - Tons 688
Expected Wood Use - $$$ $ 23,392.00
   
Expected Annual Oil Use
(Gallons in Addition to Wood)
650
Expected Annual Oil Cost
($$$ in Addition to Wood)
$1,748.50
   
Total cost of Wood and Oil (Annual) - $$$ $ 25,140.50
Expected Annual Fuel Savings -$$$ $ 101,288.00
   
Expected Savings Shown in Application $ 43,400.00

Historical Data

Base Fuel Price 1 (Used in Application) $ 2.69
Base Fuel Price 2 (Used in Application) $ -
Wood Fuel Price (Used in Application) $ 34.00

 

Five Year Fuel Use History Year 1  
Calendar Year  
Fuel Use in Gallons  
Fuel Use Cost ($) $ 
Five Year Fuel Use History Year 2  
Calendar Year  
Fuel Use in Gallons  
Fuel Use Cost ($) $
   
Five Year Fuel Use History Year 3  
Calendar Year  
Fuel Use in Gallons  
Fuel Use Cost  ($) $
Five Year Fuel Use History Year 4  
Calendar Year  
Fuel Use in Gallons  
Fuel Use Cost ($) $
   
Five Year Fuel Use History Year 5  
Calendar Year  
Fuel Use in Gallons  
Fuel Use Cost ($) $
 

 

Five Year Total Fuel Use (Gallons)  
Five Year Yearly Average Fuel Use (Gallons) 46,346
Five Year Total Fuel Cost ($) $
Five Year Average Fuel Cost ($) $

Fuel Use

Poland Regional High School

Year Ending 4/30/2013  4/30/2014 4/30/2015  4/30/2016 4/30/2017 Cumulative
Totals
 
PELLETS used 575.87         575.87 (in tons)
ACTUAL COST  $32,824.59          $32,824.59 (cost + shipping costs)
OIL used  13,363.00          13,363.00 (in gallons)
ACTUAL COST  $45,486.00          $45,486.00 (delivered cost)
TOTAL COST  $78,310.59          $78,310.59 (cost of both fuels)
 

Additional Notes



Categories

Androscoggin County, Hot Water, Wood Chips,