Poland Regional High School<!img src="/media/pdf3.png" align=left border=0> |
Description: 2.3 MMBTU/hr MAWERA Viessmann FSB 700 Wood Chip Boiler
Contact Information
Address
1457 Maine Street, Poland ME 04274
1146 Maine Street, Poland ME 04274
County
Androscoggin County
Operations Contact
Tony Bennet
Director of Operations and Maintenance
207-998-3462 ext. 122
207-754-3254
tbennett(at)rsu16(dot)org |
Existing Site Information
Facility - Type |
Public School building SAU 16 |
Multi phase project (Y/N) |
N |
Additional phase costs ($) |
na |
Facility - Size (Total) Sq Ft |
134,000 |
Total number of Students |
|
Total number of Staff (in FTE's) |
|
Building One |
Bruce M. Whittier / Poland Regional High School |
Square Feet |
134,000 |
Age |
|
Pipe Distance (ft) |
|
Building Two |
na |
Square Feet |
na |
Age |
na |
Pipe Distance (ft) |
na |
Building Three |
na |
Square Feet |
na |
Age |
na |
Pipe Distance (ft) |
na |
Building Four
|
na |
Square Feet
|
na |
Age |
na |
Pipe Distance (ft) |
na |
Current system - Type |
#2 oil |
Steam (S) or Hot Water (HW) |
HW |
Current Boiler - Name of |
Burnham V1106 |
Current Boiler Age (In Years) |
11 |
Control System (Manufacturer) |
Seimens Control Systems |
Current Type |
#2 oil |
Current Fuel Volume to be displaced (Gallons) |
47,000 |
Fuel Use Data (Years + Average) (Gallons) |
47,0000 |
Project Information
New System Boiler - Name |
MAWERA |
New System Boiler - Model Number |
FSB 700 |
New System Boiler - Rated Capacity |
2.30 MMBTU/hr |
Fuel Type (Chips Or Pellets) |
Chips |
New System Steam (s) or Hot Water (HW) |
HW |
Storage Type |
Below grade bunker |
Storage Location |
New building |
Storage Capacity Tons |
60 Ton / 7800 Cubic Feet |
Storage Description Notes |
Two overhead doors side by side, Undivided bin |
Fuel Primary Transport Type |
Hydraulic live floor |
Fuel Secondary Transport Type |
Auger |
Boiler Location (Existing Space or New Space) |
New building |
If New Space - Building Description |
Stick built metal and wood siding w metal roofing |
New Space - Size |
40' by 40' (+/-) |
Thermal Storage (Y/N) |
N |
Thermal Storage Capacity |
na |
System Connection(s) Description |
Closed loop to existing boiler room |
Heat Exchanger (Y/N) |
Y |
Grant Amount |
$ 636,372.00 |
Owner Cost Share |
$ 76,413.00 |
Total Cost |
$ 712,785.00 |
Application Date |
January 5, 2010 |
Completion Date |
July 29, 2011 |
Estimates
Historic Oil Use (Annual Average) (gallons) |
47,00 |
Historic Oil Use (Annual Average) (cost $$$) |
$ 126,430.00 |
Historic Fuel Volume to be Displaced (Gallons) |
47,000 |
Expected Cost of Displaced Fuel - Total $$$ |
$ 126,430.00 |
Base Fuel Price 1 (Used in Application) |
$ 2.69 |
Base Fuel Price 2 (Used in Application) |
$ - |
|
|
Wood Fuel Price (Used in Application) |
$ 34 .00 |
Expected Wood Use - Tons |
688 |
Expected Wood Use - $$$ |
$ 23,392.00 |
|
|
Expected Annual Oil Use
(Gallons in Addition to Wood) |
650 |
Expected Annual Oil Cost
($$$ in Addition to Wood) |
$1,748.50 |
|
|
Total cost of Wood and Oil (Annual) - $$$ |
$ 25,140.50 |
Expected Annual Fuel Savings -$$$ |
$ 101,288.00 |
|
|
Expected Savings Shown in Application |
$ 43,400.00 |
Historical Data
Base Fuel Price 1 (Used in Application) |
$ 2.69 |
Base Fuel Price 2 (Used in Application) |
$ - |
Wood Fuel Price (Used in Application) |
$ 34.00 |
Five Year Fuel Use History Year 1 |
|
Calendar Year |
|
Fuel Use in Gallons |
|
Fuel Use Cost ($) |
$ |
|
Five Year Fuel Use History Year 2 |
|
Calendar Year |
|
Fuel Use in Gallons |
|
Fuel Use Cost ($) |
$ |
|
|
|
Five Year Fuel Use History Year 3 |
|
Calendar Year |
|
Fuel Use in Gallons |
|
Fuel Use Cost ($) |
$ |
|
Five Year Fuel Use History Year 4 |
|
Calendar Year |
|
Fuel Use in Gallons |
|
Fuel Use Cost ($) |
$ |
|
|
|
Five Year Fuel Use History Year 5 |
|
Calendar Year |
|
Fuel Use in Gallons |
|
Fuel Use Cost ($) |
$ |
|
|
Five Year Total Fuel Use (Gallons) |
|
Five Year Yearly Average Fuel Use (Gallons) |
46,346 |
Five Year Total Fuel Cost ($) |
$ |
Five Year Average Fuel Cost ($) |
$ |
Fuel Use
|
Year Ending |
4/30/2013 |
4/30/2014 |
4/30/2015 |
4/30/2016 |
4/30/2017 |
Cumulative
Totals |
|
PELLETS used |
575.87 |
|
|
|
|
575.87 |
(in tons) |
ACTUAL COST |
$32,824.59 |
|
|
|
|
$32,824.59 |
(cost + shipping costs) |
OIL used |
13,363.00 |
|
|
|
|
13,363.00 |
(in gallons) |
ACTUAL COST |
$45,486.00 |
|
|
|
|
$45,486.00 |
(delivered cost) |
TOTAL COST |
$78,310.59 |
|
|
|
|
$78,310.59 |
(cost of both fuels) |
|
Additional Notes
Categories
Androscoggin County, Hot Water, Wood Chips,
Extra Files & Images:
|
|